Recently, Taylor Workshop was asked to build some customized meeting spaces for their restaurant client.  This series of six walls (plus four more off screen) are what TW came up with.  The first six hadn’t been standing for even a week

Continue reading

Taylor Workshop has been keeping busy over the last few weeks with various projects for Chick-fil-A and International Hotel Group.  IHG, for example, requested some changes to their ongoing Staybridge Suites display that required modifying hotel room walls and furniture

Continue reading

Taylor Workshop recently completed and showcased a modification to the elaborate Transparent Kitchen simulation it performed with Chick-fil-A this last month.  Can you see the Difference? There have been a few modifications to the layout that have amounted to an

Continue reading

For the last nine months or so, Taylor Workshop has been performing blitzkrieg styled builds for Chick-fil-A with the goal of finding the best of the best layouts for an “open kitchen” style initiative.  A number of Chick-fil-A restaurant experiences

Continue reading

The Holiday Inn build has been completed and updated over the last few weeks.  Taylor Workshop was given a two-and-a-half week period to design and build pieces for the layout and ended up finishing early with the two layouts’ construction.

Continue reading

IHG recently asked Taylor Workshop to construct some layouts for Holiday Inn.  These layouts will be full scale 1:1 prototypes of a room design that could some day come to fruition.  At the IHG innovation center, the Staybridge Suites build

Continue reading

Working with Chick-fil-A, Taylor Workshop was recently asked to stage an experimental new way of bagging in the restaurants. It was understood from the get-go that foam core board probably wasn’t the most stable and reliable place to mount computer

Continue reading

September, the first month of the new relationship between Taylor Workshop and IHG is now coming to a close.  This time the guys at Taylor Workshop were given the entire month of September to produce a fully constructed mid-level resolution prototype for IHG.

Continue reading
Back to top